All exterior modifications to your home or land require approval of the Architectural Control Committee. This includes home additions, roof shingle replacement, window replacement, painting of siding, window frames, or front doors, siding replacement (no vinyl, plastic, or aluminum siding is allowed), live tree removal, fences, privacy screens, dog runs, enclosures, swimming pools or hot tubs, retaining walls, gazebos/pergolas (no outbuildings or sheds are allowed), backup generators, solar panels, satellite dishes, wind energy recovery, etc.
No work may be started until the OHA Board and Architectural Committee approval is granted. Please plan accordingly. The committee will acknowledge receipt of the form within 24 hours and respond within 10 days of receipt.
Submit to Architectural Committee Chair, Chris Vespa.
​
Chris Vespa, Chair
​
Patrick Barrett
​
Travis Critten
​
Sharon Driscoll
​
Dave Schuldt